A retaining wall's price depends mostly on its height and length, the block or stone, how much digging the site needs, and access. Taller walls cost more per foot because they need more block, a bigger footing, more drainage and sometimes reinforcement or engineering. Every wall we build gets a gravel footing with drain rock and pipe behind it, which is the part cheap walls skip and the reason they fail.

What goes into the price
- Height: the biggest factor. Taller walls hold back more soil and need more of everything.
- Length: total face area of wall.
- Block or stone: styles and sizes vary in price.
- Footing: compacted gravel base trench under the first course.
- Drainage: drain rock and perforated pipe behind the wall, with somewhere for the water to go.
- Excavation and backfill: digging into the slope and hauling or placing soil.
- Access: whether equipment can reach the site.
- Engineering or permits: taller walls may need them. Check with the Pikes Peak Regional Building Department.
What not to skip
Water behind a wall pushes on it. Without drain rock and a pipe, that pressure bulges and tips walls over time. A wall without a proper footing settles unevenly. The animation shows how we build one.
1. Excavate along the wall line and cut the slope back.
Illustration, not to scale.Ways to manage cost
- Two shorter terraced walls can sometimes replace one tall one.
- A simple block may do the same job as a premium stone.
- On gentle slopes, planted beds or a boulder edge might be enough. See wall vs. sloped beds.
Questions
How much does a retaining wall cost in Colorado Springs?
It depends on height, length, materials, site prep and access. We measure and send a free, itemized quote.
Why do taller walls cost more per foot?
They need more block, a bigger footing, more drainage, and sometimes reinforcement and engineering.
Do I need a permit?
It depends on the wall and site. Check with the Pikes Peak Regional Building Department before building a tall wall.
Can you rebuild a leaning wall?
Yes. We usually take it down, build a proper footing and drainage, and rebuild.
