A paver patio is only as good as its base. We build ours on 6 to 8 inches of road base, compacted in lifts rather than one thick layer, with 1 inch of bedding sand on top, edge restraint around the outside, and polymeric sand in the joints. That combination spreads the load, drains, and resists Colorado's freeze-thaw cycles, so the patio stays flat for years.

The layers, bottom to top
- Excavation: dug down far enough for the full base plus pavers, below finished height.
- Road base, 6 to 8 inches: crushed rock that locks together and drains.
- Compacted in lifts: base goes down in layers, each compacted before the next.
- 1 inch of bedding sand: screeded flat to set the pavers.
- Pavers: laid in pattern and cut in at the edges.
- Edge restraint: locks the outside so the field can't spread.
- Polymeric sand: swept into the joints to lock pavers together and shed water.
1. Dig out to depth and haul away the old lawn and soil.
Illustration, not to scale.Why lifts matter
A plate compactor can only reach so deep. Dump 8 inches of base and compact the top, and the bottom stays loose and keeps settling after the job is done. Compacting in lifts gets the whole base dense.
Why the sand layer stays thin
Bedding sand is there to set the pavers, not hold them up. A thick sand layer shifts and washes out. Structure comes from the road base.
Drainage
The patio should be pitched slightly so water runs off and away from the house. Downspouts should discharge away from the patio, not onto it. See yard drainage.
Questions
How deep should a paver base be?
We use 6 to 8 inches of compacted road base plus 1 inch of bedding sand.
Can you lay pavers on sand only?
Not if you want them to stay flat. Sand alone shifts and washes out.
Do pavers need edge restraint?
Yes. Without it, the outer pavers creep outward and the edges drop.
What's polymeric sand?
Joint sand with a binder that hardens when wet, locking pavers together and resisting washout and weeds.